Gonna wrench tonight and tomorrow, and maybe Sunday, depends when I want to get started wrenching because thats the hard part. Lol
B74.1:
- Rebuild front and rear diffs and gearboxes. Rebuild front with 15k. Rebuild rear with 15k (previously had 30k for carpet, but I really didn't like how it drove)
- Overall clean up, tight up screws, clean and resauce tires
- Might rebuild center diff, but not sure yet
Slash 2wd:
- Overall clean up
- clean and resauce tires
- resolder battery bullets, hoping to get a better job on that
Mini B:
And pack up and get ready
I am going down to the track next Wednesday for some racing, hopefully to see some of the buddies that I haven't seen in a while.
Hoping to get the Mini B around the track when no one is on it, hoping to run at least 1 or maybe both battery packs
Hoping to get a better feel for the slash and get 2 full battery packs in. Testing out the new body cutouts I did, new gearing (26/76) and the new custom weight thing I did for the front.
After all of that, ill run the buggy to get used to it, have dinner and racing.
Gonna get there a bit earlier this time so I can find a pit space, and have more practice time, haven't done RC for a month now.
Thats the only RCing I'm doing over break. Might go out and bash the rustler around but too cold.
Did some things today, took of the carpet tires and switched to my clay track tires on the Mini B.
Used to use velcro in the battery tray for the slash and rustler, took that out. Using old spare tire foam and the stock battery hold downs