Just thought Id post up some pics of where I'm at with my crawler build so far. So far I got most of the chassis mocked up, just waiting to get the 4 links spun out on the lathe.
The Diffs are locked TLT's
Shocks are Integy Msr4's
Next step will be pick up a Stampede Tranny and probably decide how I'm going to mount the battert. (Thats why the bottom chassis plate is long). All together the wheelbase, from nut to nut, should be 13 inches.
Anyway, heres some pics of the build so far.
Where it all started...
Fresh cut chassis plates (I cut 4 sets incase I screw up..lol)
Locked (With Jb weld) Diffs
Mocked up
The Diffs are locked TLT's
Shocks are Integy Msr4's
Next step will be pick up a Stampede Tranny and probably decide how I'm going to mount the battert. (Thats why the bottom chassis plate is long). All together the wheelbase, from nut to nut, should be 13 inches.
Anyway, heres some pics of the build so far.
Where it all started...
Fresh cut chassis plates (I cut 4 sets incase I screw up..lol)
Locked (With Jb weld) Diffs
Mocked up