Yeap I've made pretty good progress. All that's left is to lay the edging around the lanes. The guys in the fab shop finally caught up on their work so they're actually working on the drivers stand now instead of just talking about working on it. When you own a business, it's always your families stuff that comes last, after all the customers are taken care of. With a big business, it's the same way just on a bigger scale. Anyway, I decided that the driver stand is going yo be 8 feet wide and 4 feet long. I wanted to be able to beat you with the antenna if you got in the lead lol. It looks great now that all the dirt is layed out, and I added a good bit mor dirt to all the jumps. The grass killer that I put down worked great. It took a lil while, but now it looks like a forest fire ran through our pasture everywhere that I sprayed it, which is a very good thing when it comes to the track. I didn't work on it a lot this week because I was building the crawler, but I will be on it again, and I'm about to order a load of rocks for the crawler course.
I'll try and get some pics of it like it is, and this weekend I'll form the jumps again and get some pics of the finished product as far as the dirt is concerned for now.