It been a few days now of running the track wet with a 50:50 ratio of clay to dirt. I’d say about 3 days now, goibg to run it wet 3 mmmore days or so and time for blue groove
I know this works this is the 4th track or so built out here with this same technique and great results.
I know this works this is the 4th track or so built out here with this same technique and great results.