Must I run all 6 to 8 tanks at once in an uninterrupted break-in process, or can I do things separately? e.g. heatcycle one night, then tanks 1-2 the 2nd night, and so on?
Just curiously though wouldn't prolong breaks e.g. 24-48 hrs in between be totally different to the kinds of cool-down breaks envisaged by engine designers?
You want the motor to heat up (around 200F) and then cool down all the way, or at least most of the way. I would think that the bigger the temp changes, between it getting 'up to temp' and 'cooled down' would produce better results. JMO. So having your break-in span a few days may be a good thing.
Well, it's only due to time constraints. If I had a day where I didn't have to worry about little ones or doing this or that I'd break it in in one day but it's tough for me to find that much time in one block.